ECTRICOL present in Barranquilla

________________ECTRICOL present in Barranquilla

In 2014, expansion and canalization works began on Calle 79 between Carrera 53 and Carrera 60 in the city of Barranquilla. A project in which the residents of Barranquilla enjoyed a renovated road in a section of 800 linear meters, with three lanes of 3.5 meters wide that will strengthen the vehicular flow and contribute to the life quality of its citizens.   The expansion of Calle 79 is replacing the existing pavement with a new structure that will improve the subgrade with a thickness of 20 cm to give uniform support to the pavement. An important aspect of the construction project on Calle 79, being a canal road, is the hydraulic solution that will improve road connectivity in this sector and allow safe mobility. The solution to the stream on Calle 79 will be achieved by channeling groundwater through a concrete box culvert and relocating public service networks.   INDUSTRIAS ECTRICOL is an important part of this renovation with its ORMAZABAL solutions, equipping the construction project with the latest in electrical technology with ORMABAT and PFU3 products, to develop safe and aesthetically pleasing underground connections for this important road in the city of Barranquilla. The PFU transformation centers consist of a concrete monoblock-structure enclosure, which houses all the electrical components: from the medium voltage switchgear to the low voltage switchboards, including transformers, control devices and interconnections between the various elements. The essential advantage of these Transformer Center is that the construction, assembly and interior equipment can be carried out entirely in-house, thus guaranteeing uniform quality and considerably reducing civil work and assembly on the installation site. In addition, its thorough design allows it to be installed both in industrial areas and in urban environments. The ORMABAT solution is a compact Transformer Center, with a monoblock structure, designed for surface installation, which can incorporate the medium voltage switchgear with SF6 insulation (CGM), the transformer, and interconnection and auxiliary elements. Its technical characteristics are ideal for this type of projects and together with the prefabricated PFU3 transformer centers, they will give a new, more modern view of Calle 79 by implementing the latest in medium voltage technology.

Projects
Terms and Conditions

Copyright © 2024 Ectricol All Rights Reserved.