Continental Gold Mining Megaproject.

________________Continental Gold Mining Megaproject.

Ectricol developed and manufactured 11 modular shelters, from 6 to 25 meters for phase 1 and phase 2 of the Continental Gold mining project in the municipality of Buriticá Antioquia, were manufactured in order to house several CCM’S.

These solutions were installed on concrete piles at a height of 2 meters above floor level.

The shelters have interior and perimeter lighting, dielectric mat, air conditioning system, fire detection system, manual extinguishing system, additionally they have stairs and platforms for access from outside.